SolVe Mounts System Builder

Calculate the bill of materials required and compare systems below

Layout Configuration

Panel Configuration

Panel Count
panels

Bill of Materials

ComponentQuantity
SolVe Mounts (1200mm centres)20
Rails24 (m)
2.38m Rail10 (pcs)
3.6m Rail7 (pcs)
Rail Connectors0
End Clamps4
Mid Clamps18
Supporting Plate/L Connector20

Mounting System Comparison Slate variant

SolVe MountsBrackets & FlashingA Slate
Installation Time (1 person)
40 minutes
288 minutes
Lost certification in MCS_012 3.0
Number of Slates to remove080 (4 slates per mount)0
Flashing or Sealant required?NoYesLost certification in MCS_012 3.0
Damage during installNoPotentially when ripping out slates, bracket bending and cracking slate/tile underneath.Lost certification in MCS_012 3.0. (Sealant).
Remedial works requiredNo.
Fit & Forget
Replace all broken slates/tiles. Replace any flashing covers that fall off in future.Lost certification in MCS_012 3.0 (Sealant)
WatertightnessYes. IPx8 ratedYes. Requires expertise.Lost certification.
Repeatable process?YesNo - Removing slates requires expertiseLost certification
Weight per box (20)3.6 kg18.28 kg20 kg
Warranty20 years5 - 12 years5 - 12 years
Solve Logo